					Quality Monitoring Program Technical Report
					
					Photo Monitoring for the 
					Vandevert Ranch Bank Stabilization Project OWEB #19-02-001
					Lower 
					Little Deschutes River Watershed, Little Deschutes Subbasin, 
					Oregon
					
					Prepared by:       Lesley 
					Jones
					
					                   Water 
					Quality Specialist
					
					                   Upper 
					Deschutes Watershed Council
					
					                   Bend, 
					Oregon
					
					Prepared for:      
					Deschutes Soil and Water 
					Conservation District
					
					                             
					Redmond, Oregon
					
					                             
					Vandevert Ranch
					
					                             
					Bend, Oregon
					 
					 
					
					Upper Deschutes Watershed 
					Council
					
					Bend, Oregon: 
					November 2006
					 
					
					
					
					Acknowledgments
					 
					The Upper Deschutes Watershed Council (UDWC) 
					would like to acknowledge the ODEQ 319 Grant Program and the 
					Oregon Watershed Enhancement Board for providing funding in 
					support of the UDWC Water Quality Monitoring Program.  This 
					program provides effectiveness monitoring for restoration 
					projects across the upper Deschutes and Little Deschutes 
					Subbasins.  The Photo Monitoring for the Vandevert Ranch 
					Bank Stabilization Project was made possible by OWEB.
					
					
					
					Abbreviations and Acronyms
					 
					
					Organizations
					 
					Deschutes Co. 
					SWCD                Deschutes Soil and Water Conservation 
					District
					UDWC              
					                        Upper Deschutes Watershed Council
					 
					
					Units
					 
					            
					Lat                                            Latitude
					            
					Long                                         Longitude
					 
					 
					
					
					
					Table of Contents
					
					
					
					1.0       
					Purpose
					
					
					 
					
					
					
					2.0       
					Monitoring Design
					
					
					 
					
					
					
					3.0       
					Results
					
					
					 
					
					
					
					5.0   
					    REFERENCES
					
					 
					
					
					List of Tables
					
					
					Table 1 Monitoring tasks
					
					
					Table 2 Photo point locations
					 
 
			
			1.0      
			
			Purpose
			The purpose of the monitoring is to evaluate 
			the success of the proposed tree placement bank stabilization 
			efforts at approximately 13 sites at the Vandevert Ranch. The 
			expected output is the qualitative interpretation of vegetation 
			success via photo point technique.  The expected outcome is to 
			provide Deschutes Soil and Water Conservation District and Vandevert 
			Ranch the information needed to track a Bank Stabilization Project 
			located 3 miles upstream Little Deschutes River confluence with the 
			Deschutes River. 
			 
			
			
			2.0            
			
			Monitoring 
			Design
			Monitoring was designed to capture pre and post 
			project information.  Pre-implementation project monitoring was 
			conducted September 23, 2002.  Implementation and 
			post-implementation project monitoring was conducted October 2002 
			and ended October 2006.  Monitoring tasks, schedule, and status are 
			reported in Table 1.  The photo points and their 
			corresponding latitude, longitude, and bearing are detailed 
			in Table 2.  Monitoring is conducted according to standards 
			detailed in the UDWC WQ Monitoring Program Standard Operating 
			Procedures; Field (UDWC 2006). Photo points were collected under 
			the USDA Photo Point Monitoring Handbook protocols (USDA 
			2002).
			 Table 1 
			Monitoring tasks
			
				
					| 
					Date | 
					Monitoring Tasks | 
					Status | 
				
					| 
					Prior to project 
					implementation (mid-September 2002) | 
					Set up permanent photo 
					points.   
					Take first photos of each 
					site. | 
					Completed | 
				
					| 
					During implementation 
					(periodically) | 
					Photos from photo points | 
					Completed | 
				
					| 
					Following project completion 
					(October) | 
					Photos from photo points | 
					Completed | 
			
			 
			Table  2 Photo 
			point locations
			
				
					| 
					Site | 
					Camera lat | 
					Camera long | 
					Camera bearing | 
				
					| Control 
					point | 
					  | 
					  | 
					320° | 
				
					| Site 1 | 
					43.99444 | 
					121.5775 | 
					306° | 
				
					| Site 2 | 
					43.9975 | 
					21.60917 | 
					180° | 
				
					| Site 3 | 
					43.01861 | 
					121.61139 | 
					312° | 
				
					| Site 4 | 
					43.99333 | 
					121.62583 | 
					66° | 
				
					| Site 5 | 
					44.02472 | 
					121.66139 | 
					142° | 
				
					| Site 6 | 
					44.02472 | 
					121.66139 | 
					4° | 
				
					| Site 7 | 
					44.03583 | 
					121.66167 | 
					328° | 
				
					| Site 8 | 
					44.08472 | 
					121.65583 | 
					326° | 
				
					| Site 8A | 
					44.08472 | 
					121.65583 | 
					88° | 
				
					| Site 10
					 | 
					44.09028 | 
					121.62472 | 
					10° | 
				
					| Site 11A | 
					43.86917 | 
					121.65361 | 
					120° | 
				
					| Site 11B | 
					43.86917 | 
					121.65361 | 
					314° | 
				
					| Site 11C | 
					43.86917 | 
					121.65361 | 
					42° | 
				
					| Site 12 | 
					43.88639 | 
					121.66417 | 
					2° | 
				
					| Site 13 | 
					43.87861 | 
					121.64194 | 
					280° | 
				
					| Site 14 | 
					43.83637 | 
					121.44647 | 
					346° | 
				
					| Site 15 | 
					43.83686 | 
					121.44677 | 
					160° | 
			
			3.0       
			RESULTS 
			(The results section presents the photos taken 
			as described in Section 2 on monitoring.  The sites are in 
			order from south to north, in the direction of the river's flow.  
			Note that there are no "Pre-implementation" photographs for some of 
			the sites.)
			
|  | 
|
|   |  
| Site 1 Pre-implementation Sept 23, 2002 |  | 
|   |  
| Site 1 Post-implementation October 23, 2002 |  | 
|   |  
| Site 1 October 19, 2006 |  | 
|   |  
| Site 2 Pre-implementation Sept 23, 2002 |  | 
|   |  
| Site 2 Post-implementation October 23, 2002 |  | |  | 
|
|   |  
| Site 2 October 19, 2006 |  | 
|   |  
| Site 3 Pre-implementation Sept 23, 2002 |  | 
|   |  
| Site 3 Post-implementation October 23, 2002 |  | 
|   |  
| Site 3 October 19, 2006 |  | 
|   |  
| Site 4 Post-implementation October 23, 2002 |  | |  | 
|
|   |  
| Site 4 October 19, 2006 |  | 
|   |  
| Site 5 Post-implementation October 23, 2002 |  | 
|   |  
| Site 5 October 19, 2006 |  | 
|   |  
| Site 6 Pre-implementation Sept 23, 2002 |  | 
|   |  
| Site 6 Post-implementation May 22, 2003 |  | |  | 
|
|   |  
| Site 6 October 19, 2006 |  | 
|   |  
| Site 7 Pre-implementation Sept 23, 2002 |  | 
|   |  
| Site 7 Post-implementation October 23, 2002 |  | 
|   |  
| Site 7 October 19, 2006 |  | 
|   |  
| Site 8 Pre-implementation Sept 23, 2002 |  | |  | 
|
|   |  
| Site 8 Post-implementation October 23, 2002 |  | 
|   |  
| Site 8 October 19, 2006 |  | 
|   |  
| Site 8A Post-implementation October 25, 2004 |  | 
|   |  
| Site 8A October 19, 2006 |  | 
|   |  
| Site 10 Pre-implementation Sept 23, 2002 |  | |  | 
|
|   |  
| Site 10 Post-implementation October 23, 2002 |  | 
|   |  
| Site 10 October 19, 2006 |  | 
|   |  
| Site 11A Pre-implementation Sept 23, 2002 |  | 
|   |  
| Site 11A Post-implementation October 23, 2002 |  | 
|   |  
| Site 11A October 19, 2006 |  | |  | 
|
|   |  
| Site 11B Pre-implementation Sept 23, 2002 |  | 
|   |  
| Site 11B Post-implementation October 23, 2002 |  | 
|   |  
| Site 11B October 19, 2006 |  | 
|   |  
| Site 11C Post-implementation October 25, 2004 |  | 
|   |  
| Site 11C October 19, 2006 |  | |  | 
|
|   |  
| Site 12 Pre-implementation Sept 23, 2002 |  | 
|   |  
| Site 12 Post-implementation October 23, 2002 |  | 
|   |  
| Site 12 October 19, 2006 |  | 
|   |  
| Site 13 Pre-implementation Sept 23, 2002 |  | 
|   |  
| Site 13 Post-implementation October 23, 2002 |  | |  | 
|
|   |  
| Site 13 October 19, 2006 |  | 
|   |  
| Site 14 Post-implementation November 4, 2004 |  | 
|   |  
| Site 14 October 19, 2006 |  | 
|   |  
| Site 15 Post-implementation November 4, 2004 |  | 
|   |  
| Site 15 October 19, 2006 |  | 
|  | 
 
			 
			
			5.0       REFERENCES
			 UDWC (2006). 
			Water Quality Monitoring Program Standard Operating Procedures; 
			Field. Prepared by Jones,            L.M., Upper Deschutes 
			Watershed Council, Oregon.
			 USDA (2002). 
			USDA Photo Point Monitoring Handbook Part A-Field Procedures. 
			Prepared by Hall, F.C.,     United States Department of 
			Agriculture, Pacific Northwest Research Station, General Technical 
			Report #PNW-GRR-526.